1.0 Application Form
2.0 Mapping
355741-MMD-00-XX-DR-N-0129_P01 Foreshore Lease/Licence Application Drawing Index
355741-MMD-00-XX-DR-N-0130_P01 Dredging/Widening Foreshore Licence Map
355741-MMD-00-XX-DR-N-0131_P01 Pedestrian Bridge Foreshore Licence Map
355741-MMD-00-XX-DR-N-0132_P01 Seamus Rafter Bridge Demolition Foreshore Licence Map
355741-MMD-00-XX-DR-N-0133_P01 Proposed Road Bridge Foreshore Licence Map
355741-MMD-00-XX-DR-N-0134_P01 Foreshore Lease Map
355741-MMD-00-XX-DR-N-0135_P01 Slipway Foreshore Lease Map
3.0 British Admiralty Chart
Admiralty Chart BA 1410 Saint George’s Channel
4.0 Scheme Drawings
355741-MMD-00-XX-DR-N-0397_P01 Drawing Index
355741-MMD-00-XX-DR-N-0400_P05 Public Exhibition Key Plan
355741-MMD-00-XX-DR-N-0401_P06 Flood Defences Plan – Sheet 1 of 6
355741-MMD-00-XX-DR-N-0402_P08 Flood Defences Plan – Sheet 2 of 6
355741-MMD-00-XX-DR-N-0403_P07 Flood Defences Plan – Sheet 3 of 6
355741-MMD-00-XX-DR-N-0404_P07 Flood Defences Plan – Sheet 4 of 6
355741-MMD-00-XX-DR-N-0405_P06 Flood Defences Plan – Sheet 5 of 6
355741-MMD-00-XX-DR-N-0406_P06 Flood Defences Plan – Sheet 6 of 6
355741-MMD-00-XX-DR-N-0407_P04 River Dredging – Longitudinal Section – Sheet 1 of 2
355741-MMD-00-XX-DR-N-0408_P04 River Dredging – Longitudinal Section – Sheet 2 of 2
355741-MMD-00-XX-DR-N-0409_P04 Flood Defences -Details – Sheet 1 of 4
355741-MMD-00-XX-DR-N-0410_P05 Flood Defences -Details – Sheet 2 of 4
355741-MMD-00-XX-DR-N-0411_P05 Flood Defences -Details – Sheet 3 of 4
355741-MMD-00-XX-DR-N-0412_P05 Flood Defences -Details – Sheet 4 of 4
355741-MMD-00-XX-DR-N-0413_P04 Benefit Drawing
355741-MMD-00-XX-DR-N-0420_P04 Site Access – Sheet 1 of 2
355741-MMD-00-XX-DR-N-0421_P04 Site Access – Sheet 2 of 2
60516655-SHT-20-0000-L-0010-E Enniscorthy Flood Defence General Arrangement Sheet 1 of 3
60516655-SHT-20-0000-L-0011-E Enniscorthy Flood Defence General Arrangement Sheet 2 of 3
60516655-SHT-20-0000-L-0012-E Enniscorthy Flood Defence General Arrangement Sheet 3 of 3
60516655-SHT-20-0000-L-7501-G Enniscorthy Flood Defence General Sections
EFDS-ROD-SBR-RSB-SK-CB-50020 River Slaney Bridge and Approach Roads Location Plan
EFDS-ROD-SBR-RSB-SK-CB-50021 River Slaney Bridge Elevation and Sections
EFDS-ROD-SBR-RSB-SK-CB-50022 Rendered Images
ENN-ACM-ZZ-ZZ-DR-AR-10108 Pedestrian Footbridge Proposed Section & Elevation
ENN-ACM-ZZ-ZZ-DR-AR-10109 Pedestrian Footbridge Proposed Visualisations
5.0 Environmental Impact Assessment Report (EIAR)
Non-Technical Summary 355741-R-010-D
EIAR Appendices
Appendix A – Scheme Supporting Information
Appendix A1 – Exhibition Drawings
Appendix A2 – Construction Environmental Management Plan (CEMP) March 2019
Appendix B – Scheme Alternatives Assessment Royal Haskinong (2009) and ROD Bridge Review Report
Appendix C – Biodiversity
- Appendix C1 – Baseline Habitat Survey Report
- Appendix C2 – Oak Woodland Survey Report
- Appendix C3 – Alluvial Woodland Report
- Appendix C4 – Macrophyte Survey Report
- Appendix C5 – Mammal Survey Report
- Appendix C6 – Bat Survey Report
- Appendix C7 – Bird Baseline Surveys Report
- Appendix C8 – Aquatic Ecology Survey Report
- Appendix C9 – Freshwater Pearl Mussel Survey Report
- Appendix C10 – A Survey of Habitat Condition for The Freshwater Pearl Mussel
- Appendix C11 – Technical Appendix – Aquatic Molluscs Margaritifera Margaritifera and Anodonta Anatina
- Appendix C12 – Back Channel Restoration Report
- Appendix C13 – An Assessment of Hydrological, Hydrogeological and Geomorphogical Conditions for the Freshwater Pearl Mussel
- Appendix C14 – Fish Translocation Salvage Outline Methodology Report
- Appendix C15 – Appendix Figures
Appendix D – Hydrology and Geomorphology
Appendix E – Ground Investigations Interpretative Report
Appendix F – Landscape and Visual Photomontages
Appendix G – Archaeology and Architectural Heritage
Appendix H – Air Quality and Climate
6.0 Natura Impact Statement (NIS)
Natura Impact Statement (NIS) Main Text
NIS Appendices
Appendix A – AA Screening report (Scott Cawley, 2018)
Appendix B – Interim Construction Environmental Management Plan (Mott MacDonald, 2019)
Appendix C – Back Channel Restoration (Ecofact, Mar 2018)
Appendix D – Macrophyte Survey (Denyer Ecology, Jul 2017)
Appendix E – Oak Woodland Survey (Denyer Ecology, Jul 2017)
Appendix F – Wet Woodland Survey (Denyer Ecology, Jul 2017)
Appendix G – Mammal Survey Report (Scott Cawley, Jan 2019)
Appendix H – Bird Baseline Surveys (Eleanor Mayes, Mar 2018)
Appendix I – Aquatic Ecology Survey (Ecofact, Mar 2018)
Appendix J – Freshwater Pearl Mussel Survey (Ecofact, Sep 2016)
Appendix K – Aquatic Molluscs Margaritifera Margaritifera and Anodonta Anatina (Dr E. Moorkens)
Appendix M – Hydrology and Geomorphology Study (Mott MacDonald, 2018)
Appendix N – Alluvial Woodland Condition Assessment and Future Prospects (Denyer Ecology, Mar 2018)
Appendix R – Fish Translocation Salvage Outline Methodology (Ecofact, Apr 2018)
7.0 Property-Related Owner Permissions/Wayleaves
8.0 Supplementary Information
Foreshore Lease Licence Application Information Submitted Summary 229355741-R-001-D